Highly strategic logistics design and build site. 34 Hectares (or will split). Very close to EU Highway.

Proposed administrative building

This green field site is set for development having obtained full planning permission to build a mix of warehousing / factory and office administration use in early 2015. Click here for Google Maps link.

Email now, Ciprian Dockie Ciprian@eaig.com

Access is by a modification from the main national Arad to Timisoara highway, very close to the slip road from the trans european motorway linking Budapest (300Km) to the west with Buccarest in the East.  The site can be sold as a whole with an option on further land, or in smaller sections in increments.

Air view

Permission is granted to upgrade the existing community road allowing access into the site from a single designated point at the rear, or by negotiation an access point closer to the main highway.

A large part of the site is visible from both the motorway and the national highway.

TOPO

2.2 Hectares on the Arad ring road (belt).

For sale as a single unit is a 2.2 hectare plot with full PP to build commercial units or unit. Click here to view on Google Maps.

Red pin shows the 2.2 hectares on the ring road

Arad is circled by an emerging ring road providing superb infrastructure for this fast emerging logistical and industrial hot house.

Email now, Ciprian Dockie Ciprian@eaig.com